Some Of Our Projects

 

Central Processing Facility and Oil Well Pad Infrastructure Works at West content-2 Oil Field, Basra IRAQ

 

Infrastructure and Construction Works at 550,000 bpd CPF and Oil Well Pads. T Wall Security Perimeters, Foundations and Construction of Substations, Utility Buildings, Underground Pipe Road Crossings, Water Piping Networks, Grouting Works, Earthworks, Access Roads, Cast in Situ Pile Foundations, Precast Production of Well Cellars, Pipe Trenches and Cable Trenches and Other Civil Works for Oil Well Pads; fast track production and installation meeting critical timetables of the oil sector; subcontractor to Samsung Engineering and LukOil Overseas.

 

Surface Facility – Bina Bawi, Erbil, IRAQ

5,000 bbl surface facility & flow line civil works and electromechanical installation for OMV Company.

 

Lsa Anaconda Water Storage & Pol Tanks

Construction of the 13 EA, 500.000Gallons capacity-Water Storage Tanks, 4 EA, 250.000 Gallons capacity-Fuel tanks with pump house/control room and underground transfer tanks as a subcontractor of Perini Management Services Inc. at LSA Anaconda IRAQ.